One record per claim: the claim in our words, the exact words of the source, the link, the kind of source, the date published and the date read, and what it connects.
Larman and Basili trace iterative and incremental development (IID) back to the 1930s work of Walter Shewhart at Bell Labs.
IID grew from the 1930s work of Walter Shewhart,1 a quality expert at Bell Labs who proposed a series of short “plan-do-study-act” (PDSA) cycles for quality improvement.
Gerald Weinberg recalled, in a personal communication quoted by Larman and Basili, that his team was doing incremental development as early as 1957 in Los Angeles.
We were doing incremental development as early as 1957, in Los Angeles, under the direction of Bernie Dimsdale [at IBM’s Service Bureau Corporation].
Royce recommended that a program developed for the first time be built twice, so that the version delivered to the customer is in effect the second one.
If the computer program in question is being developed for the first time, arrange matters so that the version finally delivered to the customer for operational deployment is actually the second version insofar as critical design/operations areas are concerned.
In his 1970 paper Winston Royce drew the simple sequence of phases, said he believed in the concept, and then called that implementation risky and failure-prone.
I believe in this concept, but the implementation described above is risky and invites failure.
The saved text is OCR of a scan of the IEEE WESCON reprint, hosted by praxisframework.org (a USC host did not answer); it has OCR errors, for example the author appears as "Rovce". The word "waterfall" does not appear in the saved text of the paper (a search of imperfect OCR text, so not proof for the printed original).
Larman and Basili call Barry Boehm's paper on the spiral model a 1985 landmark for iterative development, while noting that it is more often cited as 1986.
A 1985 landmark in IID publications was Barry Boehm’s “A Spiral Model of Software Development and Enhancement,” (although the more frequent citation date is 1986).
No copy of Boehm's own paper could be fetched (three university hosts refused or did not answer), so this rests on a secondary source. The publication year is given as 1985 or 1986 depending on the edition cited.
In January 1986 Hirotaka Takeuchi and Ikujiro Nonaka wrote in Harvard Business Review that winning at new product development now also took speed and flexibility.
The rules of the game in new product development are changing. Many companies have discovered that it takes more than the accepted basics of high quality, low cost, and differentiation to excel in today’s competitive market. It also takes speed and flexibility.
Primary source: documentThe New New Product Development Game, Harvard Business Review, by Hirotaka Takeuchi and Ikujiro Nonaka, published January 1986. Read 27 November 2026.
Only the opening of the article is readable on hbr.org without a subscription; the article's rugby image is therefore not quoted here.
In January 1994 sixteen rapid application development practitioners met in the UK, drawing on James Martin's RAD teaching, and their process definition became the Dynamic Systems Development Method (DSDM).
In January 1994, a group of 16 rapid application development (RAD) practitioners met in the UK to discuss the definition of a standard iterative process to support RAD development. The group drew inspiration from James Martin’s RAD teachings. [...] The RAD group’s process definition would eventually become the Dynamic Systems Development Method (DSDM)
Schwaber's paper names the method after the scrum in rugby and credits Takeuchi and Nonaka's 1986 article for the term.
We call the approach the SCRUM methodology (see Takeuchi and Nonaka, 1986), after the SCRUM in rugby
Primary source: documentSCRUM Development Process, Advanced Development Methods (copy hosted by jeffsutherland.org), by Ken Schwaber, published 1995. Read 27 November 2026.
The saved copy, hosted on jeffsutherland.org, lists a 1996 web page among its references, so it is a slightly later revision of the paper presented at OOPSLA 1995.
The paper's abstract says Scrum assumes that systems development is an unpredictable, complicated process that can only be roughly described.
SCRUM assumes that the systems development process is an unpredictable, complicated process that can only be roughly described as an overall progression.
Primary source: documentSCRUM Development Process, Advanced Development Methods (copy hosted by jeffsutherland.org), by Ken Schwaber, published 1995. Read 27 November 2026.
Fowler, who consulted on the Chrysler C3 payroll project, wrote that it was restarted under Kent Beck's lead in 1996 and first brought together the practices that became Extreme Programming.
was restarted under Kent Beck's lead in 1996. It was this rebooted project that first pulled together all the practices that became known as Extreme Programming
Primary source: own-postC3, martinfowler.com, by Martin Fowler, published 3 August 2004. Read 27 November 2026.
According to Fowler, Kent Beck and Erich Gamma wrote the first version of JUnit on a flight to OOPSLA 1997, and it became essential to Extreme Programming and test-driven development.
JUnit was born on a flight from Zurich to the 1997 OOPSLA in Atlanta. Kent was flying with Erich Gamma [...] JUnit took off like a rocket - and was essential to supporting the growing movement of Extreme Programming and Test Driven Development.
Secondary source: own-postXunit, martinfowler.com, by Martin Fowler, published 17 January 2006. Read 27 November 2026.
Fowler's account, written in 2006; he says he was one of the first alpha users. No statement by Beck or Gamma themselves was fetched.
Quoted from version 3.0 of the essay (2000); the essay was first presented in 1997 (see raymond-catb-1997), and the wording of this rule in the 1997 text was not checked.
Alistair Cockburn says he designed the Crystal family of methodologies while working at the Central Bank of Norway, where he helped deliver a project in 1998.
In 1998 he helped the Central Bank of Norway successfully deliver a difficult mainframe project [...] He also designed the Crystal family of methodologies while at the Central Bank of Norway.
The C3 system went live in 1997 paying about ten thousand people, and new development on it was stopped in 1999.
The software went live in 1997 paying around ten thousand people. The project continued, intending to take on a larger proportion of the payroll but new development was stopped in 1999.
Primary source: own-postC3, martinfowler.com, by Martin Fowler, published 3 August 2004. Read 27 November 2026.
Cockburn objected before the meeting to being called a lightweight methodologist.
I don't mind the methodology being called light in weight, but I'm not sure I want to be referred to as a lightweight attending a lightweight methodologists meeting.
Primary source: documentHistory: The Agile Manifesto, agilemanifesto.org, by Jim Highsmith, published 2001. Read 27 November 2026.
Quoted by Highsmith in his history page; the date field is the year of the pre-meeting discussion, which ran from September 2000 to February 2001.
During 2000 the methods were grouped in articles as "Light" or "Lightweight" processes, a name Highsmith says nobody really liked.
During 2000 a number of articles were written that referenced the category of "Light" or "Lightweight" processes. [...] In conversations, no one really liked the moniker "Light", but it seemed to stick for the time being.
Primary source: documentHistory: The Agile Manifesto, agilemanifesto.org, by Jim Highsmith, published 2001. Read 27 November 2026.
Highsmith wrote that the Snowbird meeting grew out of a gathering of Extreme Programming proponents organised by Kent Beck at the Rogue River Lodge in Oregon in spring 2000.
The meeting at Snowbird was incubated at an earlier get together of Extreme Programming proponents, and a few "outsiders," organized by Kent Beck at the Rogue River Lodge in Oregon in the spring of 2000.
Primary source: documentHistory: The Agile Manifesto, agilemanifesto.org, by Jim Highsmith, published 2001. Read 27 November 2026.
In July 2000 Fowler described Jim Highsmith's recent book on Adaptive Software Development as coming from a man who had built predictive methodologies and concluded they were profoundly flawed.
Jim Highsmith has spent many years working with predictive methodologies. He developed them, installed them, taught them, and has concluded that they are profoundly flawed: particularly for modern businesses. His recent book focuses on the adaptive nature of new methodologies
Secondary source: own-postThe New Methodology (Original), martinfowler.com, by Martin Fowler, published 21 July 2000. Read 27 November 2026.
This is Fowler's description of Highsmith's view, not Highsmith's own words.
Fowler's July 2000 survey of the new methodologies had a section on open source, saying much of that community's way of working applied to closed source projects too.
However there is a definite way of doing things in the open source community, and much of their approach is as applicable to closed source projects as it is to open source.
Primary source: own-postThe New Methodology (Original), martinfowler.com, by Martin Fowler, published 21 July 2000. Read 27 November 2026.
The open source section is in the original 2000 text; it is no longer in the 2005 revision of the article.
Martin Fowler wrote in 2000 that Extreme Programming grew out of the Smalltalk community and the collaboration of Kent Beck and Ward Cunningham in the late 1980s.
The roots of XP lie in the Smalltalk community, and in particular the close collaboration of Kent Beck and Ward Cunningham in the late 1980's.
Primary source: own-postThe New Methodology (Original), martinfowler.com, by Martin Fowler, published 21 July 2000. Read 27 November 2026.
In September 2000 Robert C. Martin of Object Mentor sent the email proposing a meeting of all the lightweight method leaders.
In September 2000, Bob Martin from Object Mentor in Chicago, started the next meeting ball rolling with an email; "I'd like to convene a small (two day) conference in the January to February 2001 timeframe here in Chicago. The purpose of this conference is to get all the lightweight method leaders in one room.
Primary source: documentHistory: The Agile Manifesto, agilemanifesto.org, by Jim Highsmith, published 2001. Read 27 November 2026.
Ward Cunningham was known for his part in object-oriented programming and Extreme Programming, and for the communities hosted by his WikiWikiWeb.
Ward is well known for his contributions to the developing practice of object-oriented programming, the variation called Extreme Programming, and the communities hosted by his WikiWikiWeb.
Andrew Hunt was a partner in The Pragmatic Programmers and co-author of The Pragmatic Programmer and of Programming Ruby.
Andrew Hunt is a partner in The Pragmatic Programmers, and co-author of the best-selling book The Pragmatic Programmer: From Journeyman to Master, the new Programming Ruby, and various articles.
Jon Kern worked with Peter Coad and Jeff De Luca on the chapter that described Feature-Driven Development.
worked with Peter and Jeff De Luca (the primary contributor to FDD) to help shape the chapter on Feature-Driven Development (FDD) in Java Modeling in Color with UML
The biographies on agilemanifesto.org carry no date; they describe the authors at about the time of the Manifesto, and some were updated later. Kern's biography was clearly updated after 2001.
Fowler first wrote his article on Continuous Integration in 2001, and credits Thoughtworks colleagues with open-source tools for it, above all CruiseControl, which he calls the first CI service.
I originally wrote this article in 2001, with an update in 2006. [...] my colleagues at Thoughtworks, have contributed a lot of open-source tooling for Continuous Integration, in particular Cruise Control - the first CI Service.
Primary source: own-postContinuous Integration, martinfowler.com, by Martin Fowler, published 18 January 2024. Read 27 November 2026.
Quoted from the current text of the article (revised 2023, dated 18 January 2024); the source does not give a release year for CruiseControl.
Highsmith wrote that the only concern about the word "agile" came from Martin Fowler, who thought most Americans could not pronounce it.
The only concern with the term agile came from Martin Fowler (a Brit for those who don’t know him) who allowed that most Americans didn’t know how to pronounce the word ‘agile’.
Primary source: documentHistory: The Agile Manifesto, agilemanifesto.org, by Jim Highsmith, published 2001. Read 27 November 2026.
Highsmith described the group as organisational anarchists and the Manifesto as a symbolic result signed by all participants.
Now, a bigger gathering of organizational anarchists would be hard to find, so what emerged from this meeting was symbolic—a Manifesto for Agile Software Development—signed by all participants.
Primary source: documentHistory: The Agile Manifesto, agilemanifesto.org, by Jim Highsmith, published 2001. Read 27 November 2026.
Highsmith recalled in 2021 that the values were written at the meeting but the twelve principles were argued over and rewritten online for three months afterwards.
Then at the meeting, we wrote the values, but the 12 principles, we argued about for three months and rewrote them and rewrote them.
Fowler wrote that the group considered several names and settled on "agile" because it captured adaptiveness and response to change.
We considered a bunch of names, and agreed eventually on “agile” as we felt that captured the adaptiveness and response to change which we felt was so important to our approach.
Primary source: own-postWriting The Agile Manifesto, martinfowler.com, by Martin Fowler, published 9 July 2006. Read 27 November 2026.
Fowler's recollection; none of the primary accounts read names the person who proposed the word.
The Manifesto states four values, each preferring one thing over another.
Individuals and interactions over processes and tools Working software over comprehensive documentation Customer collaboration over contract negotiation Responding to change over following a plan
Kent Beck Mike Beedle Arie van Bennekum Alistair Cockburn Ward Cunningham Martin Fowler James Grenning Jim Highsmith Andrew Hunt Ron Jeffries Jon Kern Brian Marick Robert C. Martin Steve Mellor Ken Schwaber Jeff Sutherland Dave Thomas
Those present represented Extreme Programming, Scrum, DSDM, Adaptive Software Development, Crystal, Feature-Driven Development and Pragmatic Programming, among others.
Representatives from Extreme Programming, SCRUM, DSDM, Adaptive Software Development, Crystal, Feature-Driven Development, Pragmatic Programming, and others sympathetic to the need for an alternative to documentation driven, heavyweight software development processes convened.
Primary source: documentHistory: The Agile Manifesto, agilemanifesto.org, by Jim Highsmith, published 2001. Read 27 November 2026.
From 11 to 13 February 2001 seventeen people met at The Lodge at Snowbird ski resort in Utah.
On February 11-13, 2001, at The Lodge at Snowbird ski resort in the Wasatch mountains of Utah, seventeen people met to talk, ski, relax, and try to find common ground
Primary source: documentHistory: The Agile Manifesto, agilemanifesto.org, by Jim Highsmith, published 2001. Read 27 November 2026.
Mike Cohn says he co-founded the Scrum Alliance and co-taught the first Certified ScrumMaster course with Schwaber in 2003.
I was a founding member of the Agile Alliance and a co-founder of the Scrum Alliance. I served on the boards of both organizations and co-taught the first Certified ScrumMaster course with Ken Schwaber in 2003.
Primary source: own-postAbout Mike Cohn, Mountain Goat Software, by Mike Cohn. Read 27 November 2026.
The two accounts may describe different things (a first course in 2002, the first course under the "Certified" name in 2003); neither source says so.
Mary Poppendieck wrote that the 2003 book Lean Software Development merged lean manufacturing principles with agile practices.
In 2003, the book Lean Software Development (Poppendieck, 2003) merged lean manufacturing principles with agile practices and the latest product development thinking
Walker Royce told Larman and Basili that his father always favoured iterative, incremental development and described the waterfall only as the simplest description.
He was always a proponent of iterative, incremental, evolutionary development. His paper described the waterfall as the simplest description, but that it would not work for all but the most straightforward projects.
In October 2005 the Eclipse Foundation announced that Cunningham was joining it to build its committer community, citing his interest in open source.
Ward Cunningham is joining the Eclipse Foundation as Director, Committer Community Development. Ward's track record of invention in areas such as wikis, patterns and agile development are known worldwide. His current interests in open source and developing communities of developers are a perfect match for the work we need to do at Eclipse.
Schwaber wrote that he created Scrum.org in autumn 2009, and that his journey with Scrum had been shaped by the desire to do the right thing and the desire to make money.
since I created Scrum.org last fall. [...] This journey has been shaped by two opposing forces: the desire to do the right thing, and the desire to make money. I formed Scrum.org to refocus my efforts on doing the right thing.
Primary source: own-postAbout Scrum.org, Scrum.org, by Scrum.org, with a letter by Ken Schwaber, published 15 June 2010. Read 27 November 2026.
The letter is dated 30 March 2010, so "last fall" is autumn 2009. The page shows an excerpt chosen by Scrum.org.
Schwaber's biography on scrumguides.org says he founded the Agile Alliance and the Scrum Alliance and left the Scrum Alliance to found Scrum.org.
he subsequently founded the Agile Alliance and Scrum Alliance. He recently left the Scrum Alliance to found Scrum.org.
Primary source: documentKen Schwaber, scrumguides.org. Read 27 November 2026.
The biography is undated; the year is from Schwaber's letter (see schwaber-founds-scrum-org-2009). The Scrum Alliance's own account of his departure was not found.
Scrum.org says Schwaber first tried to develop its programmes elsewhere and concluded that he had to break away.
Ken Schwaber initially attempted to develop Scrum.org’s programs elsewhere, but ultimately, he found that to accomplish his goal of improving Scrum knowledge, training, and implementations, he would need to break away and start Scrum.org.
Primary source: own-postAbout Scrum.org, Scrum.org, by Scrum.org, with a letter by Ken Schwaber, published 15 June 2010. Read 27 November 2026.
In January 2009 Fowler described "Flaccid Scrum": teams that adopt Scrum, which leaves out technical practices, and then slow down under a messy code base.
Scrum is process that's centered on project management techniques and deliberately omits any technical practices, in contrast to (for example) Extreme Programming.
Primary source: own-postFlaccid Scrum, martinfowler.com, by Martin Fowler, published 29 January 2009. Read 27 November 2026.
ICAgile, now the International Certification Alliance, says it was founded in 2010 as an accreditation and certification body.
Founded in 2010 as ICAgile, the International Certification Alliance (ICA) is an independent accreditation and certification body built with a global network of Member Organizations.
Primary source: documentAbout ICA, International Certification Alliance (formerly ICAgile). Read 27 November 2026.
Scaled Agile describes Dean Leffingwell's book Agile Software Requirements, published in 2011, as the foundation and first version of the Scaled Agile Framework (SAFe).
the book Agile Software Requirements had just been published in 2011. And you’ll also recognize this book as the foundation and initial version of the Scaled Agile Framework.
From a Scaled Agile blog post that carries no date in the saved text. Other accounts date the public framework to 2011 or 2012; only this one was fetched.
Asked ten years on what he would change in the Manifesto, Kent Beck told SD Times it was fine for its time and that delivering working software is not valuable if working software is not what is most needed.
I think it was fine for its time. Now I think the focus needs to shift to using a mature, transparent, responsible development process to create the greatest possible value in a larger context. Delivering working software isn’t valuable if working software isn’t what is needed most.
In October 2012 Henrik Kniberg and Anders Ivarsson published a paper on how Spotify organised its teams, with a disclaimer that they did not invent the model and that it was only a snapshot.
Disclaimer: We didn’t invent this model. Spotify is (like any good agile company) evolving fast. This article is only a snapshot of our current way of working - a journey in progress, not a journey completed.
Fowler called the book by Jez Humble and Dave Farley the foundation book on continuous delivery, which builds on continuous integration.
The book by Jez Humble and Dave Farley is the foundation book on this topic [...] Continuous Delivery builds on this, dealing with the final stages required for production deployment.
Primary source: own-postContinuous Delivery, martinfowler.com, by Martin Fowler, published 30 May 2013. Read 27 November 2026.
The fourth play of the Digital Services Playbook tells US agencies to build services using agile and iterative practices.
Build the service using agile and iterative practices We should use an incremental, fast-paced style of software development to reduce the risk of failure.
The playbook page read on 2026-11-27 carries no date; the year is that of its release (see usds-playbook-2014), and the wording may have changed since.
In March 2014 Dave Thomas wrote that the word "agile" had been subverted until it was effectively meaningless, and that the agile community had become an arena for consultants and vendors.
The word “agile” has been subverted to the point where it is effectively meaningless, and what passes for an agile community seems to be largely an arena for consultants and vendors to hawk services and products.
Primary source: own-postAgile is Dead (Long Live Agility), pragdave.me, by Dave Thomas, published 4 March 2014. Read 27 November 2026.
Thomas noted that he had himself put the word in a book title, Agile Web Development with Rails, because of the agility Ruby on Rails gave him.
When Ruby on Rails came along, I was impressed with the agility it gave me when working on web projects, so I called the book I wrote “Agile Web Development with Rails.”
Primary source: own-postAgile is Dead (Long Live Agility), pragdave.me, by Dave Thomas, published 4 March 2014. Read 27 November 2026.
Robert C. Martin wrote in 2014 that he and Kent Beck had feared in 1999 that promoting Extreme Programming could start a religion, and that the same concern was voiced at the 2001 meeting.
In 1999, when Kent Beck and I decided to put our energies into the promotion of Extreme Programming, we feared that we could be starting a religion instead of a movement, and vowed to fight ritualism when it arose. This concern and vow was expressed again in the 2001 meeting that produced the Agile Manifesto.
Primary source: own-postThe True Corruption of Agile, The Clean Code Blog (blog.cleancoder.com), by Robert C. Martin, published 28 March 2014. Read 27 November 2026.
Bertrand Meyer, introducing his 2014 book Agile! The Good, the Hype and the Ugly, called agile methods a remarkable mix of the best and the worst.
agile methods are a remarkable mix of the best and the worst; the book carefully weeds out — in the terminology of the title — the ugly from the hype and the truly good.
Primary source: own-postAccurately Analyzing Agility, bertrandmeyer.com, by Bertrand Meyer, published 2 June 2014. Read 27 November 2026.
Meyer is an outside critic, not a Manifesto author; quoted from his own blog post about the book, not from the book.
On 11 August 2014 the White House launched the U.S. Digital Service and released the Digital Services Playbook for public comment.
With today’s announcement, the Administration is also releasing for public comment two crucial components in our growing IT toolkit that will help enable agencies to do their best work – the Digital Services Playbook and the TechFAR Handbook.
Hunt wrote that the agile methods themselves had not been agile, their canonical practices having stayed essentially unchanged for over a decade.
And worst of all, agile methods themselves have not been agile. [...] The canonical agile practices of popular methods have remained essentially unchanged for over a decade.
Primary source: own-postThe Failure of Agile, toolshed.com, by Andy Hunt, published May 2015. Read 27 November 2026.
In 2015 Kniberg wrote that what had become known as the "Spotify Model" was never meant as a generic framework, only an example of how one company works.
This has come to be known as the “Spotify Model” in the agile world, although it wasn’t actually intended to be a generic framework or “model” at all. it’s just an example of how one company works.
Answering an article called "Agile is the new Waterfall", Martin wrote that the battle against waterfall was not over.
Anyone who thinks that the battle against waterfall is over simply hasn’t been fighting in the right trenches.
Primary source: own-postAgile is not now, nor was it ever, Waterfall., The Clean Code Blog (blog.cleancoder.com), by Robert C. Martin, published 16 October 2015. Read 27 November 2026.
The page says it was published on 16 February 2016 and last updated on 6 April 2022; the wording is as read on 2026-11-27. Earlier GDS guidance was not fetched.
The same page traces the principles of agile to the 2001 Manifesto and says sequential waterfall methods are less effective for services where technology changes quickly.
The principles behind agile are set out in the Agile Manifesto (2001). [...] While a sequential waterfall approach is necessary to build things like bridges and buildings, it’s less effective for building and running services when technology changes quickly.
In May 2018 Jeffries wrote that it broke his heart to see the Manifesto's ideas used to make developers' lives worse, and that developers should abandon "Agile".
So it breaks my heart to see the ideas we wrote about in the Agile Manifesto used to make developers’ lives worse, instead of better.
Primary source: own-postDevelopers Should Abandon Agile, ronjeffries.com, by Ron Jeffries, published 10 May 2018. Read 27 November 2026.
Jeffries wrote that "Agile" had become big business, led by the Scrum Alliance's Certified ScrumMaster offering, with many coaches, trainers and competing frameworks.
Led, no doubt, by the Scrum Alliance’s successful Certified ScrumMaster offering, we now see hundreds, perhaps thousands of so-called “Agile” coaches and trainers, and many competing frameworks and methods.
Primary source: own-postDevelopers Should Abandon Agile, ronjeffries.com, by Ron Jeffries, published 10 May 2018. Read 27 November 2026.
Jeffries wrote that the larger-scale methods, among them SAFe, Scaled Scrum and LeSS, appear to recommend imposing process on teams.
Larger-scale “Agile” methods appear actually to recommend imposition of process. I include here the so-called “SAFe” method, Scaled Scrum, and LeSS among others.
Primary source: own-postDevelopers Should Abandon Agile, ronjeffries.com, by Ron Jeffries, published 10 May 2018. Read 27 November 2026.
In October 2018 the U.S. Defense Innovation Board published a guide for telling real agile projects from waterfall ones "in agile clothing", since nearly every Department of Defense software project was now called agile.
Agile is a buzzword of software development, and so all DoD software development projects are, almost by default, now declared to be “agile.”
Primary source: documentDIB Guide: Detecting Agile BS, U.S. Department of Defense, Defense Innovation Board, published October 2018. Read 27 November 2026.
The document is marked "WORKING DOCUMENT // DRAFT", version 0.4, cleared for open publication on 9 October 2018.
On 9 August 2019 the Project Management Institute announced that it had acquired Disciplined Agile.
Project Management Institute (PMI), the world’s leading not-for-profit membership association for the project management profession, today announced the acquisition of Disciplined Agile (DA).
The 2020 Scrum Guide was written to be less prescriptive, after the guide had grown more prescriptive over the years.
Over the years, the Scrum Guide started getting a bit more prescriptive. The 2020 version aimed to bring Scrum back to being a minimally sufficient framework by removing or softening
The Scrum Guide revision history lists changes between the 2010, 2011, 2013, 2016, 2017 and 2020 versions.
Changes between 2017 and 2020 Scrum Guides [...] Changes between 2016 and 2017 Scrum Guides [...] Changes between 2013 and 2016 Scrum Guides [...] Changes between 2011 and 2013 Scrum Guides [...] Changes between 2010 and 2011 Scrum Guides
A U.S. Department of Defense instruction effective 2 October 2020 requires software programmes on its software acquisition pathway to use modern iterative methods such as agile or lean.
Programs will require government and contractor software teams to use modern iterative software development methodologies (e.g., agile or lean)
In the same 2021 conversation Fowler said Agile was everywhere, but that what one sees everywhere is a faux Agile rather than the real thing.
On the surface, things are looking really good, because Agile is everywhere. But the problem is that what you see everywhere is a faux Agile, as opposed to the real thing
Twenty years on, Highsmith said the Manifesto had turned out to be more than its authors had imagined or hoped for.
Yeah, I think it turned out to be more than we had imagined or hoped for. Maybe in the back of some minds, there was hopefully this will help a lot, but I'm not sure that any of us thought it would take off the way it did.
Capital One told The Register that it was not moving away from Agile and that agile delivery had become part of its core engineering practices.
The company told The Reg that its Tech organization was "not moving away from Agile and will continue to use Agile methodologies to deliver software," adding: "this change reflects how agile processes have become part of our core engineering practices.
The U.S. Government Accountability Office published its Agile Assessment Guide on 28 November 2023, describing Agile as incremental development that is continuously evaluated.
Agile is an approach to software development in which software is developed incrementally and is continuously evaluated for functionality, quality, and customer satisfaction.
Fowler describes pull requests, now common on software projects, as an artefact of GitHub that grew up mostly in open-source projects.
Pull Requests, an artifact of GitHub, are now widely used on software projects. [...] They developed mostly in the context of feature branching in open-source projects
Primary source: own-postContinuous Integration, martinfowler.com, by Martin Fowler, published 18 January 2024. Read 27 November 2026.
On 4 June 2024 the consultancy Engprax announced a survey of 600 software engineers which it said showed projects adopting Agile Manifesto practices were 268% more likely to fail.
Study consisting of 600 UK and US software engineers finds projects adopting Agile Manifesto practices are 268% more likely to fail than those which do the opposite.
Disputed. The words are Engprax's own; what is disputed is the finding. The survey was run for a book promoting an alternative method, its fieldwork lasted five days, and a Manifesto author and others rejected its definition of Agile (see the other facts in this dispute).
Engprax's announcement says the research was conducted for a new book, Impact Engineering, released the same day, and that projects using the book's approach failed only 10% of the time.
Today, new research conducted for a new book, Impact Engineering, has shown that 65% software projects adopting Agile requirements engineering practices fail to be delivered on time and within budget, to a high standard of quality. By contrast, projects adopting a new Impact Engineering approach detailed in a new book released today only failed 10% of the time.
The Register reported the study while noting that it could be seen as a thinly veiled plug for the Impact Engineering methodology.
Even though the research commissioned by consultancy Engprax could be seen as nothing more than a thinly veiled plug for the Impact Engineering methodology
PMI signed an agreement on 31 December 2024 under which the Agile Alliance joined PMI.
signed an agreement on 31 December 2024 through which Agile Alliance® joins PMI. Agile Alliance is a global non-profit membership organization founded in 2001 by some of the original authors of the Manifesto for Agile Software Development
pmi.org, agilealliance.org and businesswire.com refused the fetch tool (HTTP 403); the text is the Business Wire release as carried by FinancialContent, which labels it third-party content.
The announcement said the body would operate as PMI Agile Alliance, keep its membership structure and elected board, and that its staff would transfer to PMI.
now operating as PMI Agile Alliance. [...] PMI Agile Alliance will maintain its membership structure and elected Board, continuing its core mission and values while championing agility and the values and principles of the manifesto.
pmi.org, agilealliance.org and businesswire.com refused the fetch tool (HTTP 403); the text is the Business Wire release as carried by FinancialContent, which labels it third-party content. The Agile Alliance's own announcement was not readable for the same reason.
On 28 October 2025 the software vendor Digital.ai released its 18th annual State of Agile Report, reporting that AI adoption among respondents had risen from 68% to 84%.
Digital.ai, provider of the only AI-powered software delivery platform for the enterprise, today released its 18th annual State of Agile Report [...] AI adoption has surged: From 68% to 84%
A vendor survey, described here from the vendor's own press release (Business Wire text carried by FinancialContent; digital.ai refused the fetch tool with HTTP 403). The release does not give the number of respondents; the full report was not read.
Fowler wrote that the workshop was held in the mountains of Utah as a nod to the 25th anniversary of the writing of the Manifesto.
held in the mountains of Utah as a nod to the 25th anniversary of the writing of Manifesto for Agile Software Development
Primary source: own-postFuture Of Software Development, martinfowler.com, by Martin Fowler, published 2026. Read 27 November 2026.
Fowler heads the section "Deer Valley, Utah, February 2026"; the Thoughtworks release says Park City, Utah. The workshop ran under the Chatham House Rule.
Thoughtworks marked the 25th anniversary of the Manifesto with a retreat in Utah from 1 to 3 February 2026 on software development in the age of AI.
is marking the 25th anniversary of the Agile Manifesto by convening clients, practitioners and industry leaders for the Future of Software Development Retreat. [...] Taking place February 1–3 in Park City, Utah
Kern said of AI-assisted "vibe coding" that developers need to understand agility more than ever and not be swept away by the speed of generating code.
That's why I say you need to understand agility more than ever, and the Agile Manifesto, while you're waiting for the vibe coding to happen... brush up on some things!
At the 25th anniversary Kern told The Register that the Manifesto would endure because its first value, individuals and interactions, is key.
"It's amazing that those simple amounts of words did so much for the world, but I think it will endure because the first bullet – individuals and interactions – really is key," Kern says.
Scaled Agile's own page said, when read in November 2026, that more than 1,000,000 practitioners had been trained in SAFe and more than 20,000 enterprises had adopted it.
has been adopted by more than 20,000 enterprises across the globe. More than 1,000,000 practitioners have been trained through a role-based curriculum