Larman and Basili trace iterative and incremental development (IID) back to the 1930s work of Walter Shewhart at Bell Labs.
IID grew from the 1930s work of Walter Shewhart,1 a quality expert at Bell Labs who proposed a series of short “plan-do-study-act” (PDSA) cycles for quality improvement.
Gerald Weinberg recalled, in a personal communication quoted by Larman and Basili, that his team was doing incremental development as early as 1957 in Los Angeles.
We were doing incremental development as early as 1957, in Los Angeles, under the direction of Bernie Dimsdale [at IBM’s Service Bureau Corporation].
Larman and Basili call Barry Boehm's paper on the spiral model a 1985 landmark for iterative development, while noting that it is more often cited as 1986.
A 1985 landmark in IID publications was Barry Boehm’s “A Spiral Model of Software Development and Enhancement,” (although the more frequent citation date is 1986).
No copy of Boehm's own paper could be fetched (three university hosts refused or did not answer), so this rests on a secondary source. The publication year is given as 1985 or 1986 depending on the edition cited.
In January 1994 sixteen rapid application development practitioners met in the UK, drawing on James Martin's RAD teaching, and their process definition became the Dynamic Systems Development Method (DSDM).
In January 1994, a group of 16 rapid application development (RAD) practitioners met in the UK to discuss the definition of a standard iterative process to support RAD development. The group drew inspiration from James Martin’s RAD teachings. [...] The RAD group’s process definition would eventually become the Dynamic Systems Development Method (DSDM)
Walker Royce told Larman and Basili that his father always favoured iterative, incremental development and described the waterfall only as the simplest description.
He was always a proponent of iterative, incremental, evolutionary development. His paper described the waterfall as the simplest description, but that it would not work for all but the most straightforward projects.
Although many view iterative and incremental development as a modern practice, its application dates as far back as the mid-1950s.Secondary source: reportIterative and Incremental Development: A Brief History, IEEE Computer (copy hosted by craiglarman.com). Read 27 November 2026. The fact
So, since 2005 we have teamed up to work with clients to scale up Scrum.Primary source: documentIntroduction to LeSS, less.works. Read 27 November 2026. The fact